Case Study: Power Testings Britvic Soft Drinks Project “Maintaining critical power for the Commercial Industry”

Client: Britvic

Location:
Chelmsford, Essex

What Happened?

Power Testing Ltd were awarded a contract to upgrade the existing low voltage network that supplied the engineering workshop.Chelmsford Essex
The project involved replacing three existing 1000 kVA transformers for new 1250kVA low loss transformers, including all associated cabling.
Our specification required the design and build of a new substation that would house all three transformers and relocation of existing transformer no.6.
New substation required a blast wall to protect glass-fronted building.

What Power Testing Achieved?

 

What the customer thinks?

“Reducing our CO2 footprint and reducing supply chain risk were the two main forces behind the decision to replace our HV transformers and associated LV & HV cables.  Power Testing Ltd offered a full solution to the project including supply, installation, and commissioning as well as project planning, and management including all civils works.
Power Testing showed great flexibility and understanding of our requirements to complete the project both on time and on budget without effecting business as usual at a particularly busy production period for us.  As a result of Power Testing are now our preferred supplier for all major electrical replacement/ upgrade work