Case Study: Power Testings Citibank Bahrain Project “Maintaining critical power for the Banking Industry”

Client: Citibank, Bahrain Project Electrical Maintenance and retrofitting (2015)

Location:
Bahrain

What Happened?

Power Testing were contacted to resolve an issue that Citibank Bahrain were experiencing with spurious tripping. By discussing and identifying the problems our Client was facing we were able design a solution to meet their requirements and offer an alternative solution.


Over a number of meetings (conference calls) we were able to provide over £40,000.00 in savings by changing the original proposal using our knowledge and experience.

What Power Testing Achieved?

 

 

What the customer thinks?

“Hi, Just like to let you know that the two guys you sent to Bahrain were very professional in the way they carried out their work and were extremely knowledgeable about the ACB ‘s. I would highly recommend them to in the future.”