Aldi, Distribution Centre

image
Client name:
Aldi, Distribution Centre

Location:
Aldi, Distribution Centre, Chelmsford

Service provided:
Non-Intrusive & Intrusive Maintenance

Scope of works:
  • Oil Samples
  • Non-Intrusive Maintenance
  • Intrusive Maintenance
  • Defect Reports
  • Suggested Remedial Works
  • PFC Maintenance
  • Thermal Imaging

Download case study:

The Task

Power Testing were asked to attend site to perform Maintenance on selected switchgear and assets in accordance with industry standards and manufacturers guidelines.

Works involved Power Testing performing Intrusive and Non-Intrusive Maintenance, with all asset full Maintenance and testing inclusive of PFC Maintenance, Transformer Oil Samples and Thermal Imaging.
The Intrusive Maintenance was performed on 84 different assets in 8 different locations, including the HV Transformer, Chillers and Main Switch rooms.

Working closely with Aldi, Power Testing completed the maintenance on site to industry standards, without incident or delay fulfilling all aspects of the contract, to a high Health and Safety standard.

Full report including potential remedial works sent to the client within the arranged time frame.

Maintenance Achievements

  • Identification and mitigation of project risks
  • Worked closely with Aldi to minimize operational risk & disruption to the site
  • Efficient planning involving third parties
  • Careful planning and coordination to ensure shutdowns were kept to a minimum
  • Ensured that all timescales and deadlines were met
  • Testing all carried out to industry standards or better
  • Safe testing procedures and containment implemented to confirm a safe test area at all times
  • Prevention of HSE Issues and longtime downtime and failures

Client Feedback

“PTL Staff have worked extremely hard and it has been a pleasure to work with such professional individuals.”