Anglian Water – Flag Fen

image
Client name:
Anglian Water – Flag Fen

Location:
Anglian Water, Flag Fen, Peterborough

Service provided:
Installation of New Package Substations

Scope of works:
  • Civil Design, including ground survey works.
  • Earthing Design, including soil resistivity testing
  • Electrical Design
  • Supply and installation of all electrical equipment and associated cable
  • Completion of all civil works require to install 2No new transformer compounds

Download case study:

The Task

Power Testing Ltd successfully won the contract to complete the design, supply, installation, testing and commissioning of HV electrical works and associated civil works at Flag Fen WRC.

Works involved carry out a detailed civil, earthing and electrical designs to enable the installation of 2No new Package Substations.

Civil works were completed, creating 2No transformer compound bases which were to be installed 1M above ground due to risk of flooding.

Power Testing also completed the electrical design to correctly size the new switchgear required to suit the client’s new site electrical demands.

Power Testing successfully install and commissioned 2No new 11kV Package Substation, 2No HV Circuit Breakers and new substation earthing

Project Achievements

  • Worked closely with AW to minimise operational risks & disruption to the site operations.
  •  Careful planning and coordination to ensure the works were completed
    on programme.
  • Efficient project management involving third parties.
  • Successful energisation of newly installed equipment.

 

Client Feedback

The client was delighted with the speed and accuracy whilst installing the new system. He was very impressed with how hard the team worked and thanked PTL for how he was always kept in the loop with works.