Warburtons

image
Client name:
Warburtons

Location:
Enfield

Service provided:
Transformer B Oil Replacement & Network Maintenance

Scope of works:
  • Transformer B Oil Replacement
  • Transformer Inspection and internal cleaning
  • Transportation of 1000L of oil supply
  • Safe draining and refilling with mineral oil in a food environment
  • HV circuit breaker maintenance and inspection
  • LV switchboard and ACB maintenance
  • Protection testing across HV and LV systems
  • Network switching and isolation
  • Temporary generator connection
  • Recommissioning and return to service
  • Final testing and operational verification

Download case study:

The Task

Power Testing Limited were appointed by Warburtons Enfield to  carry out a full oil replacement on Transformer B following a failed oil sample. During the outage, PTL identified an opportunity to complete additional planned maintenance across the HV and LV network, maximising the value of the shutdown window.

Working within a 24/7 food manufacturing facility, PTL coordinated transformer maintenance, protection testing and network switching operations while supporting temporary power arrangements.

All works were completed safely and the site was returned to service ahead of schedule

Maintenance Outcome

  • Transformer B successfully drained, inspected and refilled
  • Planned HV and LV maintenance completed during the same outage
  • Full protection testing completed
  • Temporary generator not required
  • Site returned to service before midday
  • Zero incidents throughout project delivery