Who we are

Client Testimonials

An email dated 5th June 2019 from Ray Holbrook, Managing Director at Holbrook Revell Electrical Ltd
PT as a company is Power Testing, but it could also stand for Professionally Trained, Personal Touches or Preferred Team. PT have worked for me on projects for many years and I am proud to be associated with such a company of high repute and have them as part of my approved supply chain.

An email dated 15th May 2019 from Colin Barnwell, Maintenance Delivery Manager at Thames Water:

Power Testing has been delivering a variety of electrical services to the critical electrical assets owned and operated by Thames Water Utilities Limited (TWUL). This working relationship with Thames Water goes back to over 15 years. My direct working relationship with Power Testing began when I joined Thames Water in 2006.

During the time Power Testing LTD has been working for TWUL, Power Testing has delivered the following services:

Maintenance to high and low voltage electrical switchgear, transformers, cables and networks, earthing systems.

Maintenance to electrical network auxiliary systems such as battery systems, substations, lighting, indication and electrical switching controls.

Installation and replacement of electrical cables, transformers, switchgear and auxiliary equipment.

Fault finding and repair on HV and LV electrical switchgear, networks, cable fault location, cable jointing/termination, battery systems.

Installation, maintenance, testing and repair of electrical protection systems.

Lighting protection testing and repair.

Electrical installation inspection and testing.

Distribution transformer repair, fluid replacement and fault investigation.

Modification, checks or adjustment of electrical switchgear in accordance with manufacturer’s advice following notification of incidents or design defects.

Power Testing Ltd continues to deliver the electrical maintenance to our high voltage and primary low voltage assets under a framework agreement. This current agreement has been awarded following a competitive process and has been repeatedly won by Power Testing. This accounts for the proven track record power testing holds for delivering a very knowledgeable, safe, reliable and efficient service.

On the basis of my working knowledge of Power Testing Ltd, I would be happy and ready to recommend their electrical services to any other organisation.

An email dated 23.01.19 from Thames Water regarding a complete strip down and repair job on 4 x RMU’s at Swindon STW across week commencing 21st January 2019, whereby the previous RMU’s are now in perfect working order after some Kevin Smith love and affection:

“Well done at Swindon with the 4 x RMU’s PCM.”  Thanks 

A text message to Chris Park from John Crehan of OGS regarding an emergency call out at Finsbury Pavement, 30th December 2018

“Thank you for your teams efforts over the weekend (where you saved their bacon), much appreciated.”

 

An email dated 20.12.18 from Thames Water regarding cable installation at Mogden on 18th December 2018: 

“Great job Steve / Rob & PTL.  Please wish everyone at PTL a very merry Christmas.”  Thanks to all involved

An email dated 28.11.18 from Thames Water re a retrofit install at Bicester STW on 19th November 18:  

‘All went very well, very impressed with the guys and how easy it was to replace the old ACB with the new plug and play, well done.’  

An email from Clive Flitcroft regarding LV/UPS replacement project at Brick Lane, 8th November 18 :

‘As the installation work is now complete on the Brick Lane UPS / LV replacement project and whilst we transfer load back onto the new systems can I take this opportunity, on behalf of our department, to thank yourselves and your site team for the excellent work carried out. As you’re aware, this was again, as system 1 & 2, a critical path programme with zero float days and to achieve the planned daily targets whilst interacting with other companies is no mean feat.  Also your involvement in the planning and coordination phase was crucial to the success of the project so we thank you all for your assistance and early agreements to the programme. Your site engineers interacted with all other trades, including our Operations department, sky security personnel,  project designer and the Health and Safety person in a polite professional manner, thankfully with some good humour thrown in, all of  which was instrumental in the success of this project.  Please pass on our thanks to everyone involved from your organisation..’

An email from Alan Gendall of Emcor regarding works at 15 Finsbury Circus, 22nd October 2018

“Just to say a Big thank you from The Emcor on site team at 15 Finsbury Circus for a great job on Saturday, super professional and perfectly carried out, many thanks”

An email from Cormac Kavanagh of Donland Engineering dated 30th May 17

Just a quick note to thank your team and the engineers from Power Testing for a job well done over the May bank Holidays, as ever we were impressed with the organisation and efficiency of your guys, they made a very difficult project run quite smoothly and with out any significant issues. If you could pass our thanks on to all involved please.”

An email dated 14th June 2017 from Jamie Tucker at Integral stated 

I just wanted to ask if you can pass on our thanks and gratitude to your team for the support they have been providing Integral and myself here at the SHARD, there hard work and determination along with the support of your specialists has proven to be an excellent service to us. This is a clear understanding of what a service partnership should be. A really big thank you.”

An email dated 11th May 2018 from John Reed, Project Manager at CBRE regarding the BNP Paribas Switchgear upgrade Project:

Wanted to take a moment to offer a well-deserved thank you for works on the BNP Paribas Switchgear upgrade project, to yourself and all of the team involved. Through the tender stage various clarifications were requested by CBRE; Chris Williamson was always responsive, in a timely manner and with everything requested, far exceeding the efforts of the other tenderers. On being awarded the works Andy Fitzgerald owned the project from start to finish and made an exceptional effort to ensure this complex project was a success.

Confidential Client Feedback:

Please accept our thanks, and please pass on our thanks to all your colleagues, for the excellent work carried out throughout this project. Every date you set out to achieve was achieved with professionalism and great team work. This project has run over several weekends and numerous nights and its appreciated it will have put added pressure on all of you, this on top of the programme pressure, so again thanks.” Confidential Client Feedback: “Just wanted to drop you a quick line to state how impressed I was with the attitude and work ethic of your team, they delivered the work program very professionally and were quick to help out when we needed them. Overall your company has been a pleasure to deal with, we have had good communications and the preparation work was ok. The team led by yourself and Paul Wright were very good and I would have no issue in recommending your services. I wish you well in your future business and hope to work with you again.”

Confidential Client Feedback:

I would like to take this opportunity to thank your excellent team for the exceptional work they carried out. As you are aware, this was a highly technically challenging project with a demanding programme carried out in two phases. The programme was extremely important for the business as it contained a number of black building testing dates which were difficult to plan and were not moveable yet your team met all the agreed milestones and completed all phases of the project on time.

The HV and LV cabling works were excellent in both sub-stations. Technically the project involved integration with the HSS switchgear (18 VCB’s and 6 Earth switches) with the Central Computer System (CCS), the Generator Control System (GCS) and the BMS systems which your staff carried out professionally. I was particularly impressed how Josh, Peter and Patrick managed to find the panel faults and how they liaised with the manufacturer and resolved them for us without any fuss.

Your whole of your team used on this project were fantastic, totally professional with remarkable knowledge of protection systems. I would like to give particular thanks to Josh and Peter taking the lead supported by Tony, Mick, Harvey, Dan and the rest of your engineering team involved.

Also a big thanks to your office support team of Chris W, Dylan in organising your teams, help keeping us on programme and sorting out UKPN attendance and their respective orders.”

×