An email dated 13th February 2021 from the Electrical Engineer, SAP at Thames Water Utilities regarding our recent works at TWU Long Reach:

September 13, 2021

“Can you please pass on a big thank you to all involved in cable repairs at Long Reach. The team was excellent as usual with their fault finding, planning and hard work throughout repair works. The team worked in difficult circumstances, Covid, bad weather, and the unpleasant conditions that come with working on a waste water site.”

Leave a Reply

Your email address will not be published. Required fields are marked *