An email dated 17th August 2020 from the Technical Manager at OGS regarding our recent maintenance works at 20 Triton Street:

September 13, 2021

“I wanted to firstly thank your team for their patience and their efforts on the weekend supporting us in our maintenance shutdown, it was a long day and managing the power system to ensure that the clients essential & critical loads were supported was important to our client. Extreme gratitude to your two Engineers for assisting with the control/trip issue on TX1 Feeder at the end of the day.”